Pipeline Replacement Project (PRP-7) – Dredging & Trenching
Project
Pipeline Replacement Project (PRP-7)
Client
Oil and Natural Gas Corporation Ltd.
Contractor
L&T Energy Hydrocarbon
Location
North Tapti Field West Coast - India
Project Period
Dec 2023 - May 2024
The Pipeline Replacement Project-VII (PRP VII) on the West Coast of India involved EPCIC (Engineering, Procurement, Construction, Installation, and Commissioning) activities. These included a pre-engineering survey, detailed engineering, procurement, load-out, transportation, installation of pipelines, followed by as-laid and as-built surveys.
OCS Scope:
The OCS scope on the PRP VII project in India included pre-trenching along the proposed pipeline route from NTP1 to NTP2 and dredging near Platform NTP1 using the Leighton Stealth vessel.
Project execution & outcome:
Pre-trenching was carried out to achieve the bottom of the pipe 3 meters below the existing seabed. Additionally, dredging near Platform NTP1 aimed to achieve a trench depth of 19 meters from the chart datum, where water depths varied between 8 to 10 meters.
The versatile configuration of the OCS equipment setup with a trailing arm, jetting head, and twin Toyo dredge pumps on Leighton Stealth enabled:
- Dredging near the NTP1 platform to a depth of 10-12 meters below the seabed.
- Pre-trenching in water depths of up to 45 meters.
OCS Equipment setup was a hybrid setup – jet lifting & slurry pump lifting + transporting.
Jet-lift dredging utilizes high-pressure water jets that impact the seabed at high velocity, creating a suction effect that lifts sediment from the seabed. OCS owned high pressure pumps on deck were used to supply high pressure water to the jetting/dredging head equipped with nozzles.
Robust heavy-duty submersible slurry pumps with inbuilt agitators (mounted on the dredging head) were used to lift & transport fluidized seabed material through the main cords of the trailing arm from the seabed to the surface for loading onto split hopper barges or side casting.