OCS has extensive experience in all facets of jacket launching covering Engineering, planning, launch barge rig up, loadout and field launching.

OCS assists Companies and Contractors to rig up flat top barges that may not have been originally designed with launching in mind. This bespoke engineering covers  barge selection, skidways, rocker arms,  launching winches and rigging.

OCS will perform upfront engineering, procurement and fabrication as required, rig up the barge and provide an installation team to launch the jacket offshore.

launch1--300x193
No. Client Operator Project Jacket Descrip. Jacket Weight (mT) Launch Barge Used Year Completed
1
Conoco Philips, Australia
Conoco Philips, Australia
Bayu Undan
DPP
9900
Int 650
2003
2
Conoco Philips
Conoco Philips
Bayu Undan
CUP
9400
Int 650
2003
3
Talisman
Talisman
PM3
BR-E
2350
Int403
2005
4
COOEC
CNOOC
Panyu
PY30-1
20,000
Int650
2006
5
Conoco Philips, Indonesia
Conoco Philips, Indonesia
Kerisi
CPP
3700
CBL-102
2006
6
CLJOC
CLJOC
SuTuVang
CPP
4100
CBL-102
2008
7
Conoco Philips, Indonesia
Conoco Philips, Indonesia
North Belut
CPP
5700
S45
2008
8 L&T/ Sapura ONGC MHN MNP CPP 13000 S45 2011
9
VSP
PVEP
DaiHung2
DH2
4500
VSP-05
2011
10
L&T
PTTEP
Zawtika (1A)
WP1
7300
SLB1
2012
11
L&T
PTTEP
Zawtika (1A)
WP1
7400
H542
2012
12
L&T
PTTEP
Zawtika (1A)
WP1
7800
LBII
2012
13
VSP
Lamson JOC
ThangLong DongDo
TL WP
1890
VSP-05
2013
14
VSP
Lamson JOC
ThangLong DongDo
DD WP
1900
VSP-05
2013
15
VSP
VSP
Thien Ung
BKTNG
6400
Holmen Atlantic
2015
16
VSP
CLJOC
STT-PiP
STT CPP
2450
VSP-05
2015
17
COOEC
PTTEP
Zawtika (1B)
WP4
6500
HYSY229
2015
18
COOEC
PTTEP
Zawtika (1B)
WP5
5520
HYSY229
2016
19
COOEC
PTTEP
Zawtika (1B)
WP6
6520
HYSY229
2016
20
COOEC
PTTEP
Zawtika (1B)
WP7
7684
HYSY229
2016
21
MEI / PTSC
IGP
SVDN
WHP
6200
Holmen Pacific
2021

The launches highlighted in grey are the projects that OCS personnel supervised in their previous roles with first tier contractors prior to the formation of OCS 10 years ago in 2007.  It can be seen that OCS has handled 14 jacket launches since formation of the company.

OCS is equipped to handle large projects or discrete project elements depending on the specific needs of the customer. During the preparation for jacket launch or any offshore work the safety of personnel, equipment and environment plays a vital role in the success of a project and as such, HAZID’s shall be conducted prior to any operations. These meetings are attended by key engineers and supervisors and all potential risks are identified and mitigation measures put in place to ensure they are as low as reasonably practicable.

Jacket launches: Pre-Qualification Document: Download