
Project -Arkutun Dagi - Heerema Marine Contractors BV
Arkutun Dagi – Heerema Marine Contractors BV
OCS was subcontracted by Heerema Marine Contractors BV for the installation engineering for the Tie-in spool installation for the Arkutun Dagi Field Development in Sakhalin. The Arkutun Dagi Field is operated by Exxon Neftegas Limited (ENL).
Scope:
- Spool and tunnel lift engineering including spreader bar design
- Installation procedure for spools and tunnel installation
- Conceptualization and design of all installation aids
- Tunnel re-configuration Engineering (consolidating 12 sections into 3) including:
– In place analysis
– Ice loading
– Rock Placement
– CP checks - Dynamic lift analysis for motion assessment
- Grillage and seafastening analysis and design of structural components
- Transportation vessel stability
- Preparation of fabrication drawings for spools and tunnel sections