Gansar LWS, Duyong Brownfield Modification and Host Tie-in for PM 6 & 12 Gas Gansar Pipeline Installation

Project

Gansar LWS, Duyong Brownfield Modification and Host Tie-in for PM 6 & 12 Gas Gansar Pipeline Installation

Client

PETRONAS Carigali Sdn Bhd (PCSB)

Contractor

Muhibbah Engineering (M) Berhad (MEB) / PT. Timas Suplindo.

Location

Malaysia

Project Period

Feb 2024 – May 2024

Muhibbah Engineering (M) Berhad (MEB) was awarded with the EPCI contract for Gansar LWS, Duyong Brownfield Modification and Host Tie-in for PM 6 & 12 Gas Gansar Pipeline Installation.

PT. Timas Suplindo was subcontracted by MEB for the offshore Transportation and Installation scope which comprises of Gansar Jacket and Topside Installation, 10” x 40km Pipeline Installation, pipeline freespan correction, pipeline pre-commissioning, subsea spools tie-in, riser installation, jacket, topside and pipeline baseline survey.

OCS Scope:

Offshore Construction Specialists Pte Ltd (OCS) was engaged to support PT. Timas Suplindo by providing comprehensive Project Construction Management, T&I Engineering, pipeline pre-commissioning and free span correction activities.

Project Outcome:

The offshore installation campaign was successfully completed in May 2024 to the full satisfaction of all stakeholders, reaffirming OCS’s commitment to technical excellence, safety, and value creation throughout project execution.