Project- Jangkrik 2 Jetting

Jangkrik 2 Jetting

Project Jangkrik 2 Jetting
Client
PT Technip Indonesia
Location
Batam Indonesia
Period
2016
jangkrik2-1

ENI / Technip JANGKRIK COMPLEX PROJECT (2016): 

ENI Muara Bakau (Operator) in joint venture with GDF Suez (45%) is developing the Jangkrik Complex Project (JKK) inclusive of Jangkrik Main (JKK Main) and Jangkrik North East (JKNE Fields). The JKK Complex is located in the Muara Bakau PSC permit area, approximately 70km off the coast of Makassar Strait, Offshore Borneo of Indonesia. Water depths in Jangkrik Complex are ranging from 200 to 500m.

ENI awarded Technip the scope of PROVISION AND INSTALLATION OF PIPELINE, RISERS, FLOWLINES AND ONSHORE RECEIVING FACILITY (ORF), INSTALLATION OF UMBILICALS, MANIFOLD, JUMPERS AND SUBSEA CONTROLS SYSTEM, OFFSHORE HOOK-UP AND OFFSHORE COMMISSIONING FOR JANGKRIK (JKK) AND JANGKRIK NORTH EAST (JNE) FIELD DEVELOPMENT

Technip awarded the burial of the Jangkrik 24”/4” (piggyback) subsea pipelines from KP 27.733 to KP 38.990 to OCS.  Trenching water depth is 45m using the Bourbon vessel SURF Allamanda.  The operation was performed completely diverless.