Slide
Shallow Water Utility Barge “Miss Pennie”
OCS Shallow Water Utility Barge “Miss Pennie” is conceived, constructed and operated by OCS. The barge is based in Batam, Indonesia and is designed to support shallow water projects of all descriptions. OCS has purchased two units of long boom CAT 390 excavators for pre-trenching and the barge has in-built mooring winches and spuds required to support pre-trenching, post trenching, small pipelay and other strategic marine operations.
A summary of Key features of the Shallow Water Utility Barge “Miss Pennie”:
- Shallow draft of 1.2 to 1.3m with thicker keel plate of 16mm for grounding where operations dictate
- Overall layout of the barge with in-built piping system and below deck mooring system conserves deck space during marine operations
- Power generation system with two (2) units of 300 kVA and emergency 25kVA generators and fully integrated switchboard
- 90 tone Crawler crane on deck for lifting support
- Equipped with lifting padeyes for transport by heavy lift vessel
- Equipped with 3 units 18.0 metres independently driven Spuds for Shallow water Pre-trenching (to water depths of approximately 13 metres)
- Centrally controlled (with manual override) 8 point below deck mooring system (10 ton air driven winches c/w compressors and 2 x 22 m3 air receivers) and 1.5 tonnes delta flipper anchors
- In-house DGPS Barge Management Survey system
- Work boat for support work
- Knuckle Boom utility crane
- Designed to support pre-trenching, post trenching, small pipelay and other marine construction operations such as pipeline pre-commissioning, free span corrections and general marine intervention work. Can fulfil multiple functions saving the possible need for additional mobilization of additional expensive marine support vessels
- 2 units CAT 390 long boom excavators with 2.0 m3 buckets to support pre-trenching work
- 90 tonnes long boom excavators provided for pre-trenching support
- Can be fitted with OCS Trailing arm for pre and post trenching in water depths to 30 metres (unique feature)
- 60 tonnes removable stern A-frame
- Barge is strengthened to accommodate a crawler crane up to 200 tonnes capacity in special circumstances
Shallow Water Utility Barge “Miss Pennie” Technical and Project Information Download
Shallow Water Utility Barge “Miss Pennie” Specification Sheets Download